2009 – 2011

  • ROADWORKS
  • ESSO REFINERY PORT DICKSON (MAINTENANCE 2009)
  • REFRACTORY WORKS FOR BOILER
  • BERNASFACTORY, TELUK INTAN (MAJOR SHUTDOWN 2009)
  • ROADWORKS
  • CABOT (M) SDN BHD (PROJECT 2009)
  • PIPE WRAPPING WORKS
  • ESSO REFINERY PORT DICKSON (MAINTENANCE 2009)
  • EXCAVATION WORKS
  • RAHANG, SEREMBAN (PROJECT 2009)
  • BUILDING PAINTING WORKS
  • ESSO REFINERY PORT DICKSON (PROJECT 2009 – 2010)
  • CIVIL WORKS
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • ACTUATOR VALVE OVERHAUL
  • CABOT (M) SDN BHD (MAJOR SHUTDOWN 2010)
  • SLUDGE TANK CLEANING
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • SS STRAINER REPAIR
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • FLOOR EPOXY PAINTING
  • TESA D.C, BANGI (PROJECT 2010)
  • MACHINE SHIFTING WORKS
  • TESA D.C, BANGI (PROJECT 2010)
  • PIPING WORKS
  • TESA D.C, BANGI (PROJECT 2010)
  • PIPING INSULATION (PYROGEL)
  • ESSO REFINERY PORT DICKSON (PROJECT 2010)
  • METAL FABRICATION WORKS
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • CIVIL WORKS
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • PIPING INSULATION
  • ESSO REFINERY PORT DICKSON (TURN AROUND 2010)
  •  EXCHANGER INSULATION
  • ESSO REFINERY PORT DICKSON (TURN AROUND 2010)
  • METAL ROOF FABRICATION WORK
  • CABOT (M) SDN BHD (MAINTENANCE 2010)
  • CONTROL VALVE SERVICE JOB
  • DONGWHA, NILAI (SHUTDOWN 2010)
  • INSULATION WORKS
  • ESSO (M) SDN BHD (MAINTENANCE 2010)
  • SS BARRIER FABRICATION WORKS
  • ALIF FOOD, SENAWANG (PROJECT 2010)
  • UNDERGROUND PIPE WRAPPING
  • ESSO (M) SDN BHD (MAINTENANCE 2011)
  • DUCT INSULATION & PIPING INSULATION
  • CABOT (M) SDN BHD (SHUTDOWN 2011)
  • ACTUATOR OVERHAUL
  • CABOT (M) SDN BHD (SHUTDOWN 2011)
  • CONTROL VALVE OVERHAUL
  • PALM OLEO, KUNDANG (SHUTDOWN 2011)
  • METAL GRATING INSTALLATION WORK
  • CABOT (M) SDN BHD (PROJECT 2011)

 