2009 – 2011

ROADWORKS

ESSO REFINERY PORT DICKSON (MAINTENANCE 2009)

REFRACTORY WORKS FOR BOILER

BERNASFACTORY, TELUK INTAN (MAJOR SHUTDOWN 2009)

ROADWORKS

CABOT (M) SDN BHD (PROJECT 2009)

PIPE WRAPPING WORKS

ESSO REFINERY PORT DICKSON (MAINTENANCE 2009)

EXCAVATION WORKS

RAHANG, SEREMBAN (PROJECT 2009)

BUILDING PAINTING WORKS

ESSO REFINERY PORT DICKSON (PROJECT 2009 – 2010)

CIVIL WORKS

CABOT (M) SDN BHD (MAINTENANCE 2010)

ACTUATOR VALVE OVERHAUL CABOT (M) SDN BHD (MAJOR SHUTDOWN 2010)

SLUDGE TANK CLEANING

CABOT (M) SDN BHD (MAINTENANCE 2010)

SS STRAINER REPAIR

CABOT (M) SDN BHD (MAINTENANCE 2010)

FLOOR EPOXY PAINTING

TESA D.C, BANGI (PROJECT 2010)

MACHINE SHIFTING WORKS

TESA D.C, BANGI (PROJECT 2010)

PIPING WORKS

TESA D.C, BANGI (PROJECT 2010)

PIPING INSULATION (PYROGEL)

ESSO REFINERY PORT DICKSON (PROJECT 2010)

METAL FABRICATION WORKS

CABOT (M) SDN BHD (MAINTENANCE 2010)

CIVIL WORKS

CABOT (M) SDN BHD (MAINTENANCE 2010)

PIPING INSULATION

ESSO REFINERY PORT DICKSON (TURN AROUND 2010)

EXCHANGER INSULATION

ESSO REFINERY PORT DICKSON (TURN AROUND 2010)

METAL ROOF FABRICATION WORK

CABOT (M) SDN BHD (MAINTENANCE 2010)

CONTROL VALVE SERVICE JOB

DONGWHA, NILAI (SHUTDOWN 2010)

INSULATION WORKS

ESSO (M) SDN BHD (MAINTENANCE 2010)

SS BARRIER FABRICATION WORKS

ALIF FOOD, SENAWANG (PROJECT 2010)

UNDERGROUND PIPE WRAPPING

ESSO (M) SDN BHD (MAINTENANCE 2011)

DUCT INSULATION & PIPING INSULATION

CABOT (M) SDN BHD (SHUTDOWN 2011)

ACTUATOR OVERHAUL

CABOT (M) SDN BHD (SHUTDOWN 2011)

CONTROL VALVE OVERHAUL

PALM OLEO, KUNDANG (SHUTDOWN 2011)

METAL GRATING INSTALLATION WORK CABOT (M) SDN BHD (PROJECT 2011)

Keep In Touch

Downloads

Our Info

  • E-mail:
  • vjcinsulation@gmail.com
  • mohanprabu@vjcinsulation.com